Content-Length: 10065 | pFad | http://www.ospo.noaa.gov/data/messages/2020/09/MSG_20200922_2134.html
Update #1: This activity is subject to Critical Weather Day (CWD). It will slip one business day until there is not a CWD at 1500Z.
Topic: GOES-16 ABI Inner Annulus and Solar Exclusion Zone Update
Date/Time Issued: Sept 22, 2020 2129Z
Product(s) or Data Impacted: GOES-16 ABI Inner Annulus and Solar Exclusion Zone Update
Date/Time of Initial Impact: Sept 25, 2020 1500Z (Sept 24, 2020 1500Z)
Date/Time of Expected End: Sept 25, 2020 1510Z (Sept 24, 2020, 1510Z)
Length of Outage: 10 minutes
Details/Specifics of Change: A GOES-16 (GOES-EAST) ABI Inner Annulus and Solar Exclusion Zone will be updated on September 25 at 1500Z due to these values being wiped from RAM as a result of the GOES-16 ABI Autonomous Reset Anomaly. The commanding will take less than 10 minutes and timeline 19 will run at the end of the commanding sequence to reduce INR impacts. The mode 6 timeline will resume at 1510Z.
This activity is not subject to CWD.
Contact Information for Further Information: ESPC Operations at ESPCOperations@noaa.gov or 301-817-3880
GOES Payload Engineering at 301-817-4409
Web Site(s) for applicable information: N/A
Fetched URL: http://www.ospo.noaa.gov/data/messages/2020/09/MSG_20200922_2134.html
Alternative Proxies: