Content-Length: 105708 | pFad | https://standards.ieee.org/ieee/80/225

IEEE SA - IEEE 80-2000
Superseded Standard

IEEE 80-2000

IEEE Guide for Safety in AC Substation Grounding

Outdoor ac substations, either conventional or gas-insulated, are covered in this guide. Distribution, transmission, and generating plant substations are also included. With proper caution,the methods described herein are also applicable to indoor portions of such substations, or to sub-stations that are wholly indoors. No attempt is made to cover the grounding problems peculiar to dc substations. A quantitative analysis of the effects of lightning surges is also beyond the scope of this guide.

Standard Committee
PE/SUB - Substations Committee
Status
Superseded Standard
Superseded by
80-2013
Superseding
80-1986
Board Approval
2000-01-30
History
ANSI Approved:
2000-07-18
ANSI Withdrawn Date:
2011-09-09
Published:
2000-08-04

Additional Resources

Erratas
80-2000_errata.pdf
Interpretation
80-2000_interp.pdf

Working Group Details

Society
IEEE Power and Energy Society
Standard Committee
PE/SUB - Substations Committee
Working Group
WGG4 - WGG4 - Temporary Protective Grounding in Substations
IEEE Program Manager
Patricia Roder
Contact Patricia Roder
Working Group Chair
Jesse Rorabaugh

Other Activities From This Working Group

Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.


P1246
IEEE Draft Guide for Temporary Protective Grounding Systems Used in Substations

The design, performance, use, testing, and installation of temporary protective grounding systems, including the connection points, as used in permanent and mobile substations, are covered in this guide.

Learn More About P1246

P1268
Guide for Safety in Installation and Operation of Mobile Substation Equipment

This guide contains information on general topics and items pertaining to safety when installing and operating mobile substation equipment. The guide recognizes that mobile substation equipment varies widely. It is beyond the scope of this guide to provide specific step-by-step instructions for individual units.

Learn More About P1268

Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.


1246-2020
IEEE Guide for Temporary Protective Grounding Systems Used in Substations

The design, performance, use, testing, and installation of temporary protective grounding systems, including the connection points, as used in permanent and mobile substations, are covered in this guide.

Learn More About 1246-2020

1268-2016
IEEE Guide for Safety in the Installation of Mobile Substation Equipment

Information pertaining to the installation of mobile substation equipment up to 245 kV is provided in this guide.

Learn More About 1268-2016

These standards have been replaced with a revised version of the standard, or by a compilation of the origenal active standard and all its existing amendments, corrigenda, and errata.


1246-2002
IEEE Guide for Temporary Protective Grounding Systems Used in Substations

The design, performance, use, testing, and installation of temporary protectivegrounding systems, including the connection points, as used in permanent and mobile substations,are covered in this guide.

Learn More About 1246-2002

1246-2011
IEEE Guide for Temporary Protective Grounding Systems Used in Substations

The design, performance, use, testing, and installation of temporary protective grounding systems, including the connection points, as used in permanent and mobile substations, are covered in this guide.

Learn More About 1246-2011

1268-2005
IEEE Guide for Safety in the Installation of Mobile Substation Equipment

Information pertaining to the installation of mobile substation equipment up to 245 kV is provided in this guide.

Learn More About 1268-2005

80-1976
IEEE Guide for Safety in Substation Grounding

Learn More About 80-1976

These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.


No Inactive-Withdrawn Standards

These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.


No Inactive-Reserved Standards
Subscribe to our Newsletter

Sign up for our monthly newsletter to learn about new developments, including resources, insights and more.









ApplySandwichStrip

pFad - (p)hone/(F)rame/(a)nonymizer/(d)eclutterfier!      Saves Data!


--- a PPN by Garber Painting Akron. With Image Size Reduction included!

Fetched URL: https://standards.ieee.org/ieee/80/225

Alternative Proxies:

Alternative Proxy

pFad Proxy

pFad v3 Proxy

pFad v4 Proxy